  1. Select Setup > Select Operational Risk Assessment Setup under Operations. The Risk Assessments tab is displayed.


    Image Modified


  2. Click [+ Add New].

    Image Modified

    The Risk Assessment tab displays a new row:
    Image Modified


  3. Complete the applicable fields.

    Image Modified

    Field

    Description

    Risk Assessment

    Enter a name for the risk assessment.

    Formula

    Enter the formula associated with this risk assessment. For example, if the risk assessment total is calculated by summing the sub totals of the headers enter A+B. If the risk assessment total is derived by multiplying the sub total of each header enter A*B. If the risk assessment consists of a single header, enter A.

    Link to Flights

    Select the Link To Flights tick box to include the Aircraft, Pilot in Command and Flight Date fields in the risk assessment form.

    Show Score

    Select the Show Score tick box to show the score associated with the completed risk assessment in the risk assessment form.

    Active

    Select the Active tick box for the risk assessment to be immediately available to personnel with the required access level.

  4. Click []. The new risk assessment is added to the tab strip.

    Image Modified

Step 2: Create a Checklist

...

  1. Select Setup > Select Operational Risk Assessment Setup under Operations.

    Image Modified

  2. Select the tab corresponding with the required risk assessment.

    Image Modified

    The Checklist and Risk Bands panes are displayed.

    Image Modified

  3. Click [+Add Header] in the Checklist pane.

    Image Modified

  4. Enter a descriptive title for the header in the Header text text box.

  5. Enter the required formula in the Formula Group text box.

    Image Modified

  6. Click [Add].

  7. Repeat Steps 3-6 to continue adding additional headers to the checklist.

  8. Click [Add Item].

    Image Modified


  9. Enter a meaningful name for the checklist item in the Item name text box.

  10. Select the applicable header for the checklist item from the Header drop-down list.

  11. Select the applicable control type from the Control Type drop-down list.


    Control Type

    Description

    Label

    Select the Label control type to include a text label within the operational risk assessment form.

    Checkbox

    Select the Checkbox control type to include a check/tick box for the checklist item. This control is used to indicate whether the criterion specified by the checklist item is present.

    Checkbox List

    Select the Checkbox List control type to include a series of check/tick boxes for the checklist item. This control is used when one or more options may apply to the checklist item.

    Radio Button List

    Select the Radio Button List control type to include a series of radio buttons for the checklist item. This control is used where the user is required to select a unique option from a series for the checklist item.

    Dropdown List

    Select the Dropdown List control type to include a predefined list with a series of options for the checklist item. This control is used when the information to be entered into the checklist item is limited to particular words and phrases and only one option may be selected.

  12. Complete the applicable fields associated with the selected control type. For example, for the dropdown list control, you must enter each list item and the score applicable to each item.

  13. Click [Add].

  14. Repeat Steps 8-13 to continue adding additional checklist items to the checklist.

...

  1. Select Setup > Select Operational Risk Assessment Setup under Operations.

    Image Modified

  2. Select the tab corresponding with the required risk assessment.

    Image Modified

    The Checklist and Risk Bands panes are displayed.

  3. Click [+Add New] in the Risk Bands pane.

    Image Modified

  4. Enter a descriptive title for the risk band in the Risk Band text box. For example, High, Caution, Low, Abort Flight, Seek Approval etc.

  5. Enter a description of the risk band in the Description text box.

  6. Select the colour to represent the risk band from the Colour picker.

  7. Enter the minimum score that must be reached to trigger this risk band in the Minimum Score field.

  8. Select the users who must receive an email notification when the risk band is reached in the Email Notifications list.

  9. Select the users who must receive an SMS notification when the risk band is reached in the SMS Notifications list.

    Image Modified

  10. Click [Insert].

  11. Repeat Steps 3-10 to continue adding additional risk bands to the checklist.

...